1994 April 25 |
Started the production of air-conditioner drain hoses at Bang Pa-in Industrial Estate. |
---|---|
1995 | Purchased a rubber extrusion machine for the production of anti-vibration rubber compounds. |
2002 | Introduced a continuous blow-forming machine for the production of composite hoses. |
2003 | Got started the air-conditioner nozzle assembly production line. |
2004 November 1 |
Moved the factory from Bang Pa-in Industrial Estate to Amata Nakorn Industrial Estate. |
2005 | Purchased the second continuous blow-forming machine to step up the production of composite hoses. |
2006 | Started the production of tractor fuel tank assemblies. |
2008 | Purchased a large blow-forming machine to manufacture 45-liter fuel tanks. |
2009 | Purchased an anti-vibration rubber extrusion machine to step up the production of such compounds. |
2012 | Purchased the second blow-forming machine to step up the production of tractor fuel tanks. Purchased the third blow-forming machine to start the production of reserve tanks. |
2014 | Purchased the third continuous blow-forming machine to step up the production of composite hoses. Purchased a 180-ton-capacity injection molding machine. Gave a party to celebrate the 20th anniversary of FKT. |
2015 | Purchased a drain hose extrusion machine. |
2017 | Purchased a large anti-vibration rubber extrusion machine. Purchased the fifth blow-forming machine to get started the production of tiller fuel tanks. |
2018 | Purchased a 110-ton-capacity injection molding machine. Purchased a urethane foam molding machine and a turntable production machine. Started the production of operatorʼs seats. |
2020 April 1 |
Start of operation of FUKUI KASEI(THAILAND) Factory 2 |